Solar RESCO · Zero Investment Model

Solar energy at your site. Zero investment from you.

We design, finance, build, and own the solar plant at your facility. You pay a fixed rate per unit of electricity — always lower than your grid tariff.

Zero
Capex required from you
20–30%
Typical bill reduction
100%
O&M managed by us
Yours
The asset at PPA end
How it works

The RESCO model in three steps.

No upfront cost. No maintenance. No complexity. We own the plant — you own the saving.

01
Zero investment from you

We install

We design, finance, and build the solar plant at your facility. Every component — panels, inverters, mounting structure, wiring, and grid connectivity — is funded and managed entirely by us.

02
Always below your grid tariff

You buy the electricity

You pay only for the electricity the plant generates, billed at a fixed rate that is lower than your current DISCOM tariff. No capital expenditure. No maintenance responsibilities. Just a lower electricity cost.

03
At no additional cost

You own the asset

At the end of the PPA, the solar plant transfers to you at no additional cost. You then own a fully paid-off asset generating electricity at near-zero marginal cost — for the remaining life of the plant.

PPA terms

What you commit to.

The PPA is a long-term electricity supply agreement. You pay per unit consumed — nothing more. Our team walks through every clause before you sign.

C&I Clients
PPA Tenure7–10 years
Tariff structureFixed or escalating — project specific
Minimum capacity200 kW contracted load
Asset transferTo you at zero cost at PPA end
O&M responsibilitySustainable Oasis, throughout PPA
Government / PSU
PPA Tenure25 years
Tariff structurePer tender specifications
Minimum capacityPer tender requirements
Asset transferPer agreement terms
O&M responsibilityPer contract terms

We do not publish project-specific PPA tariff rates. Your rate is established during the free site assessment, based on your location, irradiance, and load profile.

What happens next

From yes to solar bill — in under six months.

We manage the entire process. Your only decision is whether to proceed.

1
Week 1–2
Free site assessment

We assess your roof or ground space, review your DISCOM bills, and prepare your savings projection.

2
Week 3–4
PPA terms agreed

We present the PPA terms and savings forecast. You review at your own pace — no pressure.

3
Week 5–8
SPV and loan sanction

We establish the project entity and secure project financing. Nothing required from you at this stage.

4
Week 8–24
EPC execution

Design, supply, installation, testing, and commissioning — fully managed by our engineering team.

Day 1
Your first solar bill

The plant goes live. Your electricity bill drops from Day 1 — at the agreed rate, lower than your grid tariff.

Is RESCO right for you?

Four criteria. Tick all four and we can start immediately.

RESCO works well for a specific type of facility. If you meet all four of these criteria, a free site assessment will confirm the economics in detail.

Peak electricity load ≥ 200 kW

RESCO is sized to your contracted demand. Facilities with a peak load of 200 kW or above are eligible. Smaller loads are typically served through other procurement channels.

Rooftop or ground space available

We need clear, unshaded area — rooftop, carport, or open ground — to install the panels. We assess and confirm during the free site visit.

Stable location for 7–10 years

A RESCO PPA is a 7–10 year agreement. The facility must be expected to remain operational at that location for the PPA tenure.

Currently paying ₹6/unit or more

The economics of RESCO improve at higher grid tariffs. If you are paying ₹6/unit or above to your DISCOM, solar typically delivers meaningful, immediate savings from Day 1.

Tick all four? A free site assessment confirms everything — your roof area, your savings projection, and the PPA terms — before you commit to anything. Schedule yours →

Frequently asked questions

Common questions about RESCO.

Get started

Book your free site assessment.

No commitment required. We visit your site, review your DISCOM bills, and present a detailed savings projection — free of charge.

No commitment required. We will contact you within one business day.